Customer: ESS BILBAO (Zamudio, Spain).
Design, manufacture of all mechanical components, integration, verifications and tests to ensure compliance with the functional requirements and specifications.
The Rotary Vacuum Union is located at the top of the target axis, connecting the target to the helium inlet and outlet pipes that are fixed and It is essential to ensure that there is no refrigerant gas leakage, for this the sealing system must incorporate a helium injection system that always guarantees that the gas contained within the system cooling of the Target Station does not leak through the Union.
The quality of the welds will be achive providing welding qualitication records (WPQR) in accordance with EN ISO 15614-1: 2018, welding procedure specifications (WPS) and welder performance qualification according to EN ISO 14732: 2013